Office Side Door
Install a flood barrier at the side entrance of the office.

Client
Office
Location
Samut Prakan
Year
2026
Type
Office
The project focuses on installing a Stop Log flood barrier system at the office side door to prepare for seasonal flooding. The system is designed for quick, manual installation and removal within minutes.





